When using Data Extractor there is data displayed at the Status tab showing the progress of current job.
What does the values on both sides of "/" mean in the Speed and Time column?
Speed/Speed and Time/Time in Status tab in Data Extractor
Moderator: Nick_TS
- DataMedics
- Advanced user
- Posts: 619
- Joined: 14.12.15
- Reputation: 18 / (177)
Re: Speed/Speed and Time/Time in Status tab in Data Extractor
speed: current/average
time: elapsed/remaining
time: elapsed/remaining
Re: Speed/Speed and Time/Time in Status tab in Data Extractor
DataMedics wrote:Source of the post speed: current/average
time: elapsed/remaining
Thank you!
(I was surprised to see the read-count for this topic keep increasing without any reply posted. I would think this was a very basic question, but I was unable to locate anything in the manual)
- DataMedics
- Advanced user
- Posts: 619
- Joined: 14.12.15
- Reputation: 18 / (177)
Re: Speed/Speed and Time/Time in Status tab in Data Extractor
I may have switched around the time ones, but you get the point.
Who is online
Users browsing this forum: No registered users and 17 guests
