Page 1 of 1
Speed/Speed and Time/Time in Status tab in Data Extractor
Posted: 24.01.17, 13:49
by rogaland
When using Data Extractor there is data displayed at the Status tab showing the progress of current job.
What does the values on both sides of "/" mean in the Speed and Time column?
Re: Speed/Speed and Time/Time in Status tab in Data Extractor
Posted: 25.01.17, 15:00
by DataMedics
speed: current/average
time: elapsed/remaining
Re: Speed/Speed and Time/Time in Status tab in Data Extractor
Posted: 26.01.17, 10:24
by rogaland
Thank you!
(I was surprised to see the read-count for this topic keep increasing without any reply posted. I would think this was a very basic question, but I was unable to locate anything in the manual)
Re: Speed/Speed and Time/Time in Status tab in Data Extractor
Posted: 26.01.17, 19:10
by DataMedics
I may have switched around the time ones, but you get the point.